Opens in a new tab

Prefab Metrics Goals achieved

  • 2026 year-end combined prefabrication goal is 6.5%
  • Prefabrication is currently tracking at 10.84% combined
  • The Prefabrication combined goal for 2027 is 11.50%

Prefabrication is Growing…

  • AK Sachs – Moog expanded their shop capacity from 43,000 square feet to 103,000 square feet so far this year
  • AK Bruce & Merrilees added an additional location in Youngstown comprising 101,000 square feet
  • AK Mona added the Ladbrook location bringing an additional 67,000 square feet 

Project Spotlight…

AK-West Memphis Prefab

The AK West Memphis shop is excelling in prefabrication. The team has established an entirely new prefab operation within an existing textile building. The facility was not originally designed for prefab operations, however, the team made several improvements to create a more efficient flow of work and materials.

Power drops and new lighting were installed early in the process to mitigate a significant lack of both components throughout the existing facility. The team also added several rows of wire racking to provide additional storage for incoming materials and completed assemblies. This not only improved material organization but also opened larger areas for assembly and production.

Jobsite Support

The AK West Memphis team have been able to provide significant support to the jobsite through several prefab initiatives, including:

  • Underground racks
  • Underground duct bank stub-ups
  • Precast wall assemblies for both fire alarm and power
  • Cable tray kitting for multiple areas of the project
  • Supplemental strut orders
  • Trapeze hangers for cable tray

These efforts have allowed the team to move several labor-intensive tasks away from the jobsite and into the controlled prefab environment, helping improve efficiency and installation readiness.

Challenges

One of the primary challenges the AK West Memphis team have faced, is sharing warehouse space with the main material supply company. Approximately half of the warehouse is being used to store incoming materials and back stock for both the prefab operation and the jobsite. Because the underground PVC conduit and cable tray are also being stored outside at the facility, the available space for storing completed prefab assemblies is limited.

Processes That Are Working Well

A process that is working particularly well, is using an assembly-line approach to completing larger tasks. By completing different components of an assembly before moving to final assembly, the AK Memphis team have been able to create a more efficient workflow. This approach has helped the team maintain production while keeping work organized and moving out the door on schedule.

Most everyone on the AK West Memphis team is new to the prefab environment, which has presented an opportunity for significant growth. The team has adapted quickly, and everyone continues to improve each day. Their willingness to learn and take ownership has been a major factor in our ability to meet production demands and support the jobsite effectively.

Continuous Improvement

AK West Memphis implemented the CIP (Continuous Improvement Program) early in the project, which has been continuously beneficial. It has helped create an environment where employees feel that their ideas and concerns are being heard. Dustin Benson worked with a prefabrication material supplier and several outside representatives to provide meaningful gifts and recognition to the AK West Memphis workforce.

AK West Memphis has since expanded this effort into the prefab-wide CIP program, taking employee engagement and continuous improvement to a higher level. Although the AK West Memphis team have a large number of new employees within the prefab workforce, they are improving every day.

Team Development

New opportunities have become available for employees who have not previously held supervisory responsibilities, allowing them to take on supervisory roles. The new foremen that have been placed in leadership roles have taken ownership of daily huddle boards and have developed a strong understanding of why Prefabrication tracks KPIs each day. The AK West Memphis team are encouraged by witnessing the foremen embrace these responsibilities and understand the purpose behind the prefab processes.

Overall, the AK West Memphis prefab operation has made significant progress. The AK West Memphis team have overcome several challenges, established processes that are working well, and developed a team that continues to grow and improve. The team have confidence in the foundation that is established, which will allow them to continue to increase efficiency and provide strong support to the jobsite.


Prefab Design Offerings:

  • Personnel Update: Bill Dougherty is the new AK Diefenderfer Prefab Manager and Mike McCraken is the new Prefab Manager
  • Congratulations to Josh Clark on his promotion to AK Prefab Operations Director, East Region
  • A tremendous thanks to the AK Bruce & Merrilees workers who filled in as Prefab Managers, their efforts kept the projects moving along
  • Congratulations to Pete Majocha who is now part of the Prefab Design team
  • The JotForm Prefab Catalog will begin rolling out for AK Mona, AK Parsons, and AK Sprig in October 2026.

How Prefab is Making a Difference…

“With labor shortages impacting many regions across the country, it would be difficult to meet the aggressive schedule for our Polaris Forge project in Fargo without prefabrication.
The ability to shift labor hours offsite and leverage resources where labor is available, has been critical to maintaining schedule commitments.”

– Ken Gangl, General Superintendent

“What sets ArchKey’s prefab department apart isn’t just the output — it’s how responsive they are to changing scopes. They’ve adapted quickly to design revisions and kept our schedule intact more than once.”

– David Marsh, Senior Project Manager


Core Values in Prefabrication

Team Spotlight: Rob Birkenmeyer Steps Up

On a late Friday afternoon, a project manager received the kind of call nobody wants — a long-standing customer’s MV gear had gone down, and full normal coverage wasn’t available for support until Sunday. That’s a long gap to leave a customer without help.

Rob Birkenmeyer, from our prefab design team, had worked with this customer and PM before and he knew their equipment inside and out. Rather than let the gap sit, Rob Joined others and went in Friday evening and again Saturday morning to keep things stable until our regular coverage could take over Sunday and finish the job.

Rob’s familiarity with this equipment didn’t just solve a problem quickly — it meant the work was done safely, by someone who knew exactly what he was walking into rather than someone starting from scratch on unfamiliar MV gear. This is “Own the Outcome and Safety Without Compromise” in action, and it is exactly the kind of initiative that keeps ArchKey’s reputation strong with the customers who have trusted us for years.