Goodyear World Headquarters
Scope of Work
At the 639,000 SF, 7-story building, ArchKey US Communications designed and installed the comprehensive network cabling infrastructure for the tire manufacturer’s corporate campus.
This project included:
- Mass deployment of high-speed copper networks from local telecommunication closets straight to workstation desks, conference hubs, and lab spaces
- Structured pathways, equipment racks, and organized patch panel distribution networks within the central corporate data hubs
- Structured wiring to support distributed, enterprise-grade Wi-Fi access points across the entire multi-wing floor plan
- Providing integrated cabling networks capable of simultaneously transmitting data and power to smart building infrastructure
Let’s Power What’s Next Together
Whether you’re planning your next project or your next career move, we’re ready to help you succeed.