Naya Apartments, developed and constructed by The Sobrato Organization, include 156 apartment units. This new construction project consisted of an infrastructure build-out to a 384,481-sq-ft multi-family development. The 4-story development, which is constructed with a wood frame stucco exterior, includes 82 one-bedroom units and 74 two-bedroom units. The project is built around a central podium and features an underground parking garage with space for 400 cars, a clubroom, resident lounge, fitness center, pool, and leasing office.
The scope of work included electrical service into all the buildings and into each apartment unit as well as installed the conduit and infrastructure for the fire alarm and low voltage wiring systems. LED lighting with motion sensors were installed on every fixture throughout the two-level underground parking garage. The infrastructure for all the electrical rooms that are adjacent to the garage were built out. Wiring was provided to the two-level fitness facility, including a 3,000-sq.-ft. clubroom and kitchen for residents, the residents lounge, the leasing office, the pool vestibule with a dog wash area and several onsite car chargers. ArchKey/Sprig served as the electrical design-build subcontractor on this project and installed/procured all systems in its scope of work.
CA License #296728-C10 / AZ License #CR-11 ROC 347093