One of five utility-scale solar projects across Texas and California with a combined capacity of 1.7 GWdc. The Titan project is a 375 MW solar farm in Culberson County that is expected to produce approximately 800 GWh annually, enough to power almost 77,000 Texas homes. Located on former grazing land, this project was constructed with minimal impact on the local environment.